I made my first cutting error. A sheet of T111 is 8 feet by 4 feet. I needed one to end up being 72 inches which leaves a 24 inch piece. I had two other pieces that were supposed to be 13 inches and 12½ inches totaling 12.5 inches. I cut those two pieces from the piece of T111 that was supposed to end up being 72 inches. That left me 1.5 inches short. Cost of a new sheet of T111 = $40! For 1½ inches! In the long run, I won’t have to route any of the siding to make it fit so this is probably $40 well spent.
Category: Of Being Dad
Fatherly posts.
Weekend Project Day 6
This is the second weekend of Amy’s birthday present. Sarah’s birthday is this week. So after making a little progress on a programming project, I allowed myself a milestone break to get the upper half of the second wall in place. My weekend goal had been All walls complete and rafters begun. Once the second wall was in place, we whisked over to the inlaws to celebrate father’s day. Upon return I convinced myself that I should do a 3rd wall before returning to programming (you can program in the dark). The materials for my 4th wall are a full 1½ inches short. How that happened is beyond me. So after the 3rd wall, progress came to a grinding halt. Tomorrow I’ll pickup another sheet of T111 and that will give us enough material to finish the walls in short spurts during the week. Hopefully before the next rains come we can have the rafters in place to support a tarp or perhaps even the roof done.
Weekend Project On Hold
Today would be a perfect day to make great progress on a club house. Unfortunately, duties call and I must produce code.
Weekend Project Day 5
Weekend Project Day 4
I came home last night to settle into some programming and realized that the weekend was going to be wet. Wet is good for programming but bad for construction so I traded. Last night, was Day 4 of Amy’s birthday present/weekend project. Half the headers got done.
Weekend Project Day 3 – 6th Wall Secured
The Little Miss Project
Amy had but one wish for her birthday…a clubhouse. And she received basically one present…a pile of lumber for a clubhouse. We are building The Little Miss by WoodManor.net. Below are the timelapse videos of the first two days of work. I cannot give you these 20 minutes of your life back. The audio at the beginning of the 2nd video corrects rather quickly. The best parts of each video are the last two minutes so skip to minute 6 on the first video and minute 10 on the second.
The Little Miss Project
Yesterday of a 27 step plan, we completed steps 1, 2, 3, and 4.
Weekend Project
Weekend Project – Footers
Weekend Project – Foundation
This weekend’s project
Happy Birthday Amy!
What an amazing eight years!
Making a girl’s 8th birthday wish come true
Amy has her mind set on a club house for her 8th birthday (tomorrow!).
The Fantasy
On Saturday morning, Ty Pennington and his crew from Extreme Makeover Home Edition show up with a bobcat and the materials to build The Queen Anne or the Spoiler. By Saturday evening, a portion of the yard has been contoured, landscaped and become home to Amy’s new playhouse in which we celebrate her birthday inside.
The Reality
Saturday I build the Little Miss by myself leaving landscaping for a different weekendlifetime. Sunday afternoon, we celebrate Amy’s birthday inside and around her clubhouse.
Cathy’s fear
The construction will be delayed and problematic and Amy will go without any semblance of a birthday present until the end of the summer or worse.
The Wishful Desire
Any volunteers want to grab hammers and shovels and help me put this together in one day on this coming Saturday? Does beer and pizza still work in exchange for labor?
And you can bet there will be a timelapse of the build.
Of Being Dad
File this under things that make me twitch.
Tommy, in a phone call to me: "By the way, my laptop hasn’t worked for the past week and a half or so. Says something about no bootable media."
Me: "Did you install anything recently or drop it?"
Tommy: "No but there are two screws missing on the bottom."